The Shrimad Bhagavad Gita & Bharat Muni’s Natyashastra are now inscribed in UNESCO’s Memory of the World Register.
This global honour celebrates India’s eternal wisdom & artistic genius.
These timeless works are more than literary treasures—they are philosophical and aesthetic foundations that have shaped Bharat’s world view and the way we think, feel, live, and express.
With this, we now 14 inscriptions from our country on this international register.
This global honour celebrates India’s eternal wisdom & artistic genius.
These timeless works are more than literary treasures—they are philosophical and aesthetic foundations that have shaped Bharat’s world view and the way we think, feel, live, and express.
With this, we now 14 inscriptions from our country on this international register.
☀️ Welcome to the solar kingdom of Earth — the Bhadla Solar Park, located in the blazing deserts of Rajasthan, India. 🏜️⚡
Spread across 5,700+ hectares of scorched land where temperatures often soar above 45°C (113°F), this solar giant isn’t just big — it’s the biggest in the world. 🌍🔋
Built in four epic phases (2015–2020), here’s how the clean energy empire came to life:
Phase 1: 65 MW ☀️ — the spark that started it all.
Phase 2: 680 MW 🔥 — now we’re cooking.
Phase 3: 1,000 MW ⚡ — power-up mode activated.
Phase 4: 500 MW 💥 — the final push.
📦 That’s 10 million solar panels installed across the desert, generating a jaw-dropping 2,245 MW (or 2.245 gigawatts) of renewable power. Enough to light up millions of homes — and hope.
🎯 India’s goal? To make 17% of its electricity come from the sun. With Bhadla shining at full strength, that dream isn’t far off.
This isn’t just a solar park — it’s a monument to clean energy, built in one of the harshest environments on Earth… and it’s absolutely thriving. 🌞🇮🇳⚡
Spread across 5,700+ hectares of scorched land where temperatures often soar above 45°C (113°F), this solar giant isn’t just big — it’s the biggest in the world. 🌍🔋
Built in four epic phases (2015–2020), here’s how the clean energy empire came to life:
Phase 1: 65 MW ☀️ — the spark that started it all.
Phase 2: 680 MW 🔥 — now we’re cooking.
Phase 3: 1,000 MW ⚡ — power-up mode activated.
Phase 4: 500 MW 💥 — the final push.
📦 That’s 10 million solar panels installed across the desert, generating a jaw-dropping 2,245 MW (or 2.245 gigawatts) of renewable power. Enough to light up millions of homes — and hope.
🎯 India’s goal? To make 17% of its electricity come from the sun. With Bhadla shining at full strength, that dream isn’t far off.
This isn’t just a solar park — it’s a monument to clean energy, built in one of the harshest environments on Earth… and it’s absolutely thriving. 🌞🇮🇳⚡
UPSC TAMIL MEMES
FR-CSM-2024-Engl-220425.pdf
Roll number starting with 12 is TN aspirants
India freezes water flow from Sindh to Pakistan.
In retaliate Pakistan suspended the Shimla Agreement.
In retaliate Pakistan suspended the Shimla Agreement.